Tru-Jump STR-14FT Assembly, Installation, Care, Maintenance And User Instructions page 21

14ft trampoline and enclosure with airdunk basketball system and water anchor
Table of Contents

Advertisement

Step 6 – Spring Assembly
Ø
Continue to attach springs in the same manner. For even distribution of tension and ease of assembly, the
springs must be placed on opposite sides of the mat in an alternating manner, i.e. 10 then 46, 28 then 64, etc.
In addition to the previously installed springs, you should now have springs at 10, 28, 46 and 64 as shown
below.
17

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the STR-14FT and is the answer not in the manual?

Table of Contents

Save PDF