Operation - red lion 6RLAG-3LTT Manual

Engine-driven aluminum trash pump
Table of Contents

Advertisement

Available languages

Available languages

caution:
do not run the pump Before priming it. the seal and impeller could Be permanently damaged.
a)
preparing the engine: Follow the engine manufacturer's
instructions before operating.
b)
priming the pump: Remove the priming plug, fill the casing
with water until full, and replace the plug. If the pump is below
the level of the water that will be pumped (flooded suction), the
pump will automatically fill up when the valves are open.
caution: do not operate this pump dry!
c)
start-up: Start the pump. In a flooded suction situation, the
pump will discharge the water almost immediately. If the suction
Discharge
head
Typical water pump

operation

line is above the water level being pumped, it will take a few
minutes to lift the water to the casing and then to discharge it. If
the suction line is quite long, the pump may overheat before the
water in the suction line reaches the pump. In this case, turn the
pump off and drain the casing. Wait a few minutes for the seal
in the pump casing to cool down. caution: If the overheated
casing is filled while hot, damage to the seal will occur. Replace
the drain plug and refill the casing with water. Replace the priming
plug and restart the pump.
figure 1
2
Total head
Suction lift
25 ft. (8 m) max

Advertisement

Table of Contents
loading

This manual is also suitable for:

6rlag-3htt

Table of Contents