Preparation For Operation; Operational Preparations; Inserting The Battery; Carrying Out Measurements - BEHA LanTest 50 Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

4 .0

Preparation for Operation

4.1

Operational Preparations

The power supply is carried out via the enclosed battery.
4.2

Inserting the battery

Prior to commissioning, insert the battery. For this
purpose it is imperative that the user complies with
the references described in paragraph 4.3 regarding
battery handling!
Remove the casing rear
Connect the battery supplied by respecting the polarity to the battery clip and
insert it.
Replace the three casing screws and retighten them.
5.0

Carrying out measurements

5.1

Operation Elements an Connections

Bild Lantest 50 -01
26
RJ45
5
4
3
2
1/2
3/6
4/5
PAIRS TEST
1
TEST
FAULTS
STATUS
= OPEN
= SHORT
= REVERSED
7
= LOW
BATTERY
= SPLIT
PAIRS
= CROSSED
PAIRS
6
8
7/8
1
9
a
9
9
b

Advertisement

Table of Contents
loading

This manual is also suitable for:

870150

Table of Contents