Placing A Container On The Ground - Efco Swaploader SL-330 Parts And Operation Manual

Table of Contents

Advertisement

PLACING A CONTAINER ON THE GROUND

1.
Move the sliding jib all the way back (right control backward) until mechanical jib
latches unlock.
2.
Tilt the arm backwards (left control backward). When the container touches the ground,
release the brakes to free the truck for forward movement caused by the container.
3.
Rotate jib all the way till the container touches the ground. Pull away from container and
rotate jib back into the transport position.
WARNING:
1.
2.
SL-330.OPE
07/2009
DON'T OVER SPEED THE PUMP
1,500 RPM MAXIMUM.
DON'T DUMP ON UNEVEN GROUND.
3-3

Advertisement

Table of Contents
loading

Table of Contents