Hoist Installation - Efco Swaploader SL-330 Parts And Operation Manual

Table of Contents

Advertisement

1.
Place the SL-330 hoist assembly on the truck chassis. The truck chassis mounting
surface should be flat without any steps or protrusions. If necessary shim bars need to be
added to ensure a flat surface on which to support hoist. The truck chassis should meet
the following minimum specifications (See Figures A):
RBM for each frame channel: 1,600,000 in.-lb.
Total RBM: 3,200,000 in.-lb.
Minimum clear frame rail for mounting: 191" (See Fig. A&B)
Front Axle Cap: 12,000 lb. (Min)
Total Rear Axle Capacity: 21,000 lb. (Min)
CT Dim: 132" to 138" (138" preferred)
CA Dim: 142" to 156" (156" preferred)
Note: The above specifications are a minimum requirement. It is the responsibility
of the owner/operator to ensure the completed chassis meets or exceeds all federal,
SL-330.INS
09/2009
HOIST INSTALLATION TO TRUCK CHASSIS
Figure A
Figure B
2-2

Advertisement

Table of Contents
loading

Table of Contents