Step 7. Assembling The Lower Stays And Canvas - Hamron 619-466 User Instructions

Garage tent
Table of Contents

Advertisement

Available languages

Available languages

f) Secure using wire (25) and wire lock (26).

STEP 7. ASSEmBLING THE LoWER STAYS AND cANVAS

the canvas is fitted with stay tunnels top to bottom along the walls on each side. the white side
should be facing inwards.
a) lay out the canvas with the stay tunnels along the frame wall and the white side facing upwards.
b) fit the stay (7) and (8) in 4 pairs (2 x pairs for each side)
7
the figure below shows the placement of the stays once they are inserted in the canvas.
8
EN
SE
53

Advertisement

Table of Contents
loading

Table of Contents