Download Print this page

Siemens EcoView 8 DO Installation Instructions page 2

Hide thumbs Also See for EcoView 8 DO:

Advertisement

Document No. 129-565
Installation Instructions
April 28, 2015
Figure 1: EcoView™ 8 DO Module Reset Button Location.
Commissioning the 8 DO Module
In order to commission the EcoView 8 DO Module to
the ZigBee network, the DO module needs to be reset.
1. Press the recessed Reset button four times in
rapid succession (see Figure 1).
 The NET light stops flashing.
 The NET light starts flashing again once it has
joined the ZigBee network.
2. Press the Reset button once to send the Node ID
information to the EcoView Touchscreen.
Assigning the 8 DO Module to the
Touchscreen
1. Press the EcoView Touchscreen CONFIG button
for one second and then release it to display the
Configuration screen (see Figure 6).
2. Press the DEVICE SETTINGS icon.
3. Press the Configure tab.
 The EcoView 8 DO Module's MAC address displays
in the Unassigned Nodes list. (See Figure 6.)
 Assigned and unassigned EcoView 8 DO
Modules, EcoView Multi-phase Meters, and
EcoView Thermostats display in the
Configured Device list.
NOTE: Join devices one-at-a-time. This minimizes any
confusion caused by having several MAC
addresses displayed on the screen at one time.
4. Select a device from the Unassigned Nodes list
to start the Device Configuration Wizard.
Page 2 of 5
Figure 2: Device Settings/Configure Tab.
5. Select the Resource Controller device driver
from the list, and then press the Next button.
Figure 3: Device Wizard Driver Selection.
6. If needed, select the Relay Delay parameter to
edit the value, and then press the Next button.
Figure 4: Device Wizard Parameters.
Siemens Industry, Inc.

Advertisement

loading