Chapter 4: Vep4600 Installation; Unpack; Vep Expansion Card Installation - Dell EMC VEP4600 Installation Manual

Hide thumbs Also See for EMC VEP4600:
Table of Contents

Advertisement

To install the VEP4600, complete the installation procedures in the order presented in this section.
Always handle the platform and components with care. Avoid dropping the platform or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the VEP4600 and components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this platform.
Topics:

Unpack

VEP Expansion Card installation

Ground lug
Rack or cabinet hardware installation
Alternative mounting positions
Two-post installation
Four-post installation
Optics installation
Platform power-up
Unpack
Unpack the platform carefully.
NOTE:
Before unpacking the platform, inspect the container and immediately report any evidence of damage.
When unpacking the platform, make sure that the following items are included:
● One VEP4600
● One RJ-45 to DB-9 female cable
● Two-post rail kit; no tools required
● One or two country- or region-specific AC power cords, depending on the configuration
● VEP4600 Setup Guide
● Safety and regulatory Information
● Warranty and aupport Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the platform from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
VEP Expansion Card installation
The VEP4600 platform offers the following features:
NOTE:
Customers are not to attempt installing Virtual Edge Platform (VEP) 4600 expansion cards. A Dell EMC Certified
technician must perform this installation.
CAUTION:
The mezzanine cards are intended for professional installation only.
16
VEP4600 installation
VEP4600 installation
4

Advertisement

Table of Contents
loading

Table of Contents