Auger Installation; Storage And Maintenance; Replacement Parts - Chapin 8201A Assembly / Operation Instructions / Parts

Hide thumbs Also See for 8201A:
Table of Contents

Advertisement

Available languages

Available languages

AUGER INSTALLATION

• Screw auger onto impeller shaft. Screw
auger retaining nut into auger hole with M6
socket driver. Tighten completely with
wrench to secure.

STORAGE AND MAINTENANCE

• When finished spreading empty hopper of any remaining material
• Thoroughly wash spreader and allow to dry before storing
• To fold down handle:
- Simply remove the bottom two bolts on the handle
- Loosen two thumb nuts and fold down handle
- Replace two bottom bolts
- Tighten thumb nuts completely

REPLACEMENT PARTS

2
1
7
Ref.#
Qty
Part No.
1
1
6-9071
2
1
6-9040
3
1
6-9001
4
1
6-9073
5
1
6-9048
6
1
6-9061
7
1
6-9020
8
1
6-9021
9
1
6-9022
10
1
6-9050
11
1
6-9083
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
3
8
9
Description
Gear Box Assembly
Drive Shaft w/2 bearings
Grate
Bail Assembly
Auger
Impeller
Wheels w/hardware & instructions
Thumb Nuts
Hardware Bag
Rear Baffle
Baffle System
4
5
10
6
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents