Auger Installation; Storage And Maintenance - Chapin 81000A Assembly / Operation Instructions / Parts

80 lb.
Hide thumbs Also See for 81000A:
Table of Contents

Advertisement

Available languages

Available languages

AUGER INSTALLATION

• Screw auger onto impeller shaft. Screw auger retaining nut into auger hole with M6
socket driver. Tighten completely with wrench to secure.
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position (do not hold bail down when filling)
• Determine appropriate setting for material being used by reading the suggested setting on the
material's bag. Be sure to read the instructions on the bag/box of the material you're spreading
to identify accurate setting needed)
• To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
• To stop spreading simply let go of the bail and the gate will close
BAFFLE OPERATING INSTRUCTIONS
• Adjust baffle by hand to block distribution accordingly.
• Use wing nuts to adjust tension on baffles.

STORAGE AND MAINTENANCE

• When finished spreading empty hopper of any remaining material
• Thoroughly wash spreader and allow to dry before storing
• To fold down handle:
- Simply remove the bottom two bolts on the handle
- Loosen two M6 Hex nuts and fold down handle
- Replace two bottom bolts
- Tighten M6 Hex nuts completely
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents