Step 6: Auger Installation - Chapin 82108N Assembly / Operation Instructions / Parts

Professional/contractor salt spreader 80 and 100 lb.
Table of Contents

Advertisement

Available languages

Available languages

Step 4: Install the Axle/Drive Shaft
a. Slide the Drive shaft through one side of the hopper
frame.
b. Slide gearbox onto axle/drive shaft (make sure
"FRONT" is facing front of frame as shown) and align
middle hole with gearbox.
c. Slide through the other side of the hopper frame.
Assemble M5 x 35mm Hex bolt to Axle/Gearbox and
secure with M5 Nylon Locknut.
Step 5:
Attach non-drive Wheel onto exposed end of Axle
and secure with Flat Washer & Cotter Pin. Slide
the Flat Washer onto the Axle until it makes contact
with the Wheel, and then slide the Cotter Pin into
the hole at the end of the Axle.
Additional Notes:
Drive Shaft: Hole Near Middle should be closer to
the right wheel so that the gear box is centered.

Step 6: Auger Installation

Install auger to impeller shaft. Attach with R-clip.
NOTE: Auger is designed to work in forward motion.
Excessive reverse motion could cause binding. If resistance
is felt while pulling spreader backwards, stop and clear salt
from auger.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
M5 x 35mm Hex bolt
Bend

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

82088n

Table of Contents