Assembly; Drive Shaft/Power Head; Throttle Linkage And Ignition Leads - Echo PE-2601 Operator's Manual

Power edger
Table of Contents

Advertisement

14
A
SSEMBLY
/
DRIVE SHAFT
POWER HEAD
Tools Required: 4 mm Hex Wrench
Parts Required: Power head, Drive shaft Assembly
1.
Loosen, the bolt (A) at engine drive shaft clamp.
2. Carefully fit drive shaft assembly to engine making sure that
inner drive shaft engages into clutch mount.
NOTE
Lower gear housing and head assembly must be in line with the
engine.
3.
Turn drive shaft housing so that center line of housing (B) is
midway between the two arrows on shaft.
4. Tighten bolt (A).

THROTTLE LINKAGE AND IGNITION LEADS

1. Close choke and remove air filter cover.
2. Connect ignition stop leads (A) and (B).
3.
Place throttle linkage (C) through adjustment fixture (D) and install
wire end into large carburetor throttle swivel hole (E). Check throttle
for freedom of movement and that wide open throttle / low idle
extremes are adjusted properly. The throttle linkage must be
adjusted by moving the adjustment fixture (D). Consult with your
Echo Dealer for correct adjustment procedure.
4. Install air filter cover.
B
A
C
A
D
B
E

Advertisement

Table of Contents
loading

Table of Contents