Assembly; Drive Shaft/Power Head; Throttle Linkage And Ignition Leads - Echo PE-225 Operator's Manual

Power edger
Hide thumbs Also See for PE-225:
Table of Contents

Advertisement

ASSEMBLY

ASSEMBLY

Drive Shaft/Power Head

Parts Required:
Power Head, Drive Shaft Assembly
1. Stand engine on a level surface.
2. Remove vinyl cap from drive shaft.
3. Loosen the two bolts (A) at drive shaft end of engine.
4. Carefully fit drive shaft assembly to engine, making sure that
inner drive shaft engages into clutch mount.
Note: Rotate the drive shaft housing until edger housing is in
line with the engine.
5. Tighten bolts (A).

Throttle Linkage and Ignition Leads

1. Close choke and remove air filter cover.
2. Place throttle linkage (A) into adjustment fixture (B) and
install wire end into large carburetor throttle swivel hole (C).
Check throttle for freedom of movement and that wide open
throttle / low idle extremes are adjusted properly. The
throttle linkage must be adjusted by moving the adjustment
nut (D). Consult with your Echo Dealer for correct
adjustment procedure.
3. Tighten nut (E).
4. Connect 2 ignition stop leads (F, G) from throttle cable
tubing to 2 ignition leads (F, G) on engine.
14
A
I
D
A
E
B
F
G
PE-225
C
H
X7722279201
©3/2015 ECHO Inc.

Advertisement

Table of Contents
loading

Table of Contents