R8177
Figure 8-2 Lift Cylinder (Full Free Lift)
4.
Reconnect tube (14,
and secure the tube with screw (16), lock washer
(17) and flat washer (18).
5.
Position header (15), bracket (34) and angle (11)
on top of cylinder (18) and secure with screw (8),
lock washer (9) and flat washer (10).
8-4
Figure
8-5) to connector (15)
6.
Install bushing (14), sheave (13) on angle (11)
and secure with bolt (12), lock washer (9) and flat
washer (10).
7.
Install lift chains as described in paragraph
8.
Lift inner mast (11) and remove the blocking.
9.
Fill the hydraulic reservoir. Use hydraulic oil listed
in
Table
2-2.
10. Disengage the emergency power disconnect
switch and turn on key switch.
BL-J1-192-0315 - 11-19-2019
7-4.