Wolf TopSon F3-1 Installation, Operating And Maintenance Instructions page 27

Table of Contents

Advertisement

Installation of the
intermediate panels
Create a fold
3062165_201508
Roof integration - Slate roof
Intermediate panel
1. Push in the intermediate panels as per diagram. If this should foul during
the installation, correct the collector position. Then bend the tabs at the top
of the intermediate panels to prevent them from sliding through.
2. Tighten all screws and nuts to secure the collector.
3. Fully peel back the protective foil from the flashing tape and affix the flashing
tape to the tiles. Create an upstanding fold at the ends of the flashing tape
bases on the left and right (see Fig.).
Tabs
Intermediate panels
Fold
Flashing tape
15-60°
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Topson f3-1qTopson f3-q

Table of Contents