IBM Power 775 Service Procedure page 22

D-link service procedure
Hide thumbs Also See for Power 775:
Table of Contents

Advertisement

STEP 32
Clean the other end of the cable. See
STEP 33
Repeat STEP 30 for the D-Link Optical connector at the other end of the cable. Plug the connector into the port by
pushing either on the strain relief boot at the rear of the connector, or by pushing on the push/pull tab.
Proceed to STEP 43.
Power 775 D-Link Service Procedure
PN: 41U8487, EC N44172
Section
2.3.1.
22 of 27

Advertisement

Table of Contents
loading

Table of Contents