2.6. TRANSPORT AND HAULING OF THE MACHINE

• All of our machines are extensively tested in the factory and delivered as
perfectly assembled situation. If there is any damage happened to machine,
the transportation company must be informed at once.
• Besides that, all of the standard and optional accessories specified on the
documents must be checked whether they are existing or not.
• Transport and placement of the machine must be handled with the proper
transport means.
• Pay attention to the warning remarks on the package for transport and storing
of the machine.
• Maximum quantity of the machine to be stowed as one above the other is 3.