4.4 LIFTING INSTRUCTIONS CONT.
LIFTING POINT
An eye bolt lifting point has been provided on the top
of the machine. (Fig.4.1)
When lifting the machine only certified lifting slings
should be used.
Ensure that when lifting, the machine does not tip over.
Check that the lifting slings do not interfere with the
parts of the machine that may be damaged.

4.5 ANCHORING TO THE FLOOR

OPTIONS FOR MOUNTING
The machine is best mounted on a concrete slab.
Masonry anchors with bolts are the best way to anchor
machinery, because the anchors sit flush with the floor
surface, making it easy to unbolt and move the machine
later, if needed. (Fig. 4.2)
4.6 MACHINE LEVELLING
To set your machine up so that it operates to optimum
performance, apply the following procedure
After your machine has been anchored to a concrete slab
floor, it then needs to be leveled. Loosen the hold down
bolts and place a level on the surface of the working table.
Metal shims need to be placed under corner of the base of
the machine until level. Once level then tighten the hold
down bolts. (Fig. 4.3).
NOTE: The machine must not rest on supports other than
those defined in Fig. 4.3
OPERATION MANUAL
12
F
. 4.1
ig
F
. 4.2
ig
h
D
olD
own
F
. 4.3
ig
b
olt
M
s
etal
hiM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bp-480aW4330W4340

Table of Contents