Baxi Assure Horizontal SHRU Installation And Maintenance Manual page 12

Waste water heat recovery unit
Table of Contents

Advertisement

4.2.2 INSTALLATION - METHOD 2
1
Ensure that there is enough space for an easy installation of
Assure Horizontal SHRU.
2
Install a 90° elbow Ø40mm. Ensure that elbow is fully inserted
past the seal in the unit.
Ø40mm
3
If necessary, use a section of appropriately rated PVC of the
desired length.
12

Advertisement

Table of Contents
loading

Table of Contents