WDM PI Operation Manual page 45

In-line vertical pump
Table of Contents

Advertisement

PI Operation Manual
17.
Assemble and insert the packing gland onto the shaft.
a)
Assemble the two equal pieces of the packing gland.
b)
Insert two screw bolts into the split packing gland. The head of both bolts should be in the
same side.
c)
Place the two corresponding nuts into the screw bolts.
Figure 6.41 Assembling the two equal pieces of the packing gland.
Figure 6.42 Inserting two screw bolts into the split packing gland.
Figure 6.43 Placing the two corresponding nuts into the screw bolts.
45
www.wdmpumps.com

Advertisement

Table of Contents
loading

Table of Contents