WDM PI Operation Manual page 27

In-line vertical pump
Table of Contents

Advertisement

PI Operation Manual
3. Introduce the shaft inside the impeller until it reaches the step on the shaft.
Figure 6.3 Introducing the shaft inside the impeller until it reaches the step on the shaft.
4.
Place the impeller lockwasher into the shaft's impeller side.
Figure 6.4 Placing the impeller lockwasher into the shaft's impeller side.
27
www.wdmpumps.com

Advertisement

Table of Contents
loading

Table of Contents