Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
Description
No parts required
No parts required
Qty.
-
Prepare the machine.
Preparing the machine equipped with
-
MyRide.
4
6
1
1
Install the weights.
2
2
6
Installing the guards on the machines
-
equipped with MyRide.
1
2
4
2
2
Install the attachment mount.
1
2
2
2
1
Install the latch rod.
1
1
Assemble the bagger top.
1
2
1
2
Install the bagger top.
4
4
1
Install the chute.
1
1
Connect with the discharge tube.
5
Use