STEP 3:
1. Attach the Right Swing Arm (6R) onto the long axle of the Handlebar post (4). Use Hex bolt (33), Spring
washer (51), Flat washer (34), Waveform washer (25) and Long axle (39) as shown. Do not tighten yet.
2. Attach the Right Connecting Rod (5R) to the Crank (14). Use Pedal bolt (26R), Waveform washer (25),
Spring washer (15) and Nylon nut (16R) as shown. Please do not tighten yet.
Attention!
Install the Right Pedal bolt (26R), CLOCKWISE and the Left Pedal
bolt (26L), COUNTERCLOCKWISE. You can turn the crank help you
install the Pedal bolts smoothly.
10
CT-02