Electrical Requirements - Bunn Smart Wave Series Installation And Operating Manual

Bunn coffee brewer installation & operating guide
Table of Contents

Advertisement

CAUTION - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
100V & 120V
Models
120 & 230 volt ac models
Note: This electrical service consists of 2 cur-
rent carrying conductors (L1 and Neutral) and
a separate conductor for chassis ground.
Electrical Hook-Up
CAUTION – Improper electrical installation will damage electronic components.
1.
An electrician must provide electrical service as specifi ed.
2.
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3.
If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
• This appliance must be installed in locations where it can be overseen by trained personnel.
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.
• Appliance shall not be tilted more than 10° for safe operation.
• An electrician must provide electrical service as specifi ed in conformance with all local and national codes.
• This appliance must not be cleaned by water jet.
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of
this appliance by a person responsible for its safety.
• Children should be supervised to ensure they do not play with the appliance.
• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with
a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.
• Machine must not be immersed for cleaning.

ELECTRICAL REQUIREMENTS

230 VOLT CE Model
CE REQUIREMENTS
Page 4
WHITE
NEUTRAL
RED
L2
120
120
VAC
VAC
208 or 240
VAC
120/240 VOLT Model
120/208 & 120/240 volt ac models
Note: This electrical service consists of 3 current
carrying conductors (Neutral, L1 and L2) and a
separate conductor for chassis ground.
GREEN
BLACK
L1
CHASSIS GROUND
40410 011110

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smart wave silver series

Table of Contents