6
Operation
6 Operation
1. VALVE INSPECTION BEFORE OPERATION:
- Supply air to the actuator;
- Open and close the valve several times;
- Check that the valve works correctly and accurately.
WARNING!
Hand crushing hazard. During operation there is a risk of crushing
inside the valve body in the area between the actuator and the valve
body.
Check the supply pressure on the valve head is correct.
26
A
NC
A
NO
EN-IST-BBZK-0821