4 Installation Inspection
This section describes conducting a series of inspections after completing the system installation
procedure so as to ensure that the installation was done correctly.
Inspection
Inspect the following items after installing the X-618 system and before turning the system on:
Check if sufficient heat ventilation space is left above the DA appliance.
Check the protective grounding cables to make sure they were correctly connected.
Check the connections of the power supply to which the power supply cables are connected.
Check the connection between system components
After inspection, set the functions according to customers' requirements.
Manual Setting
Inquiring the device IP
Through DCS operation, device can announce the IP address in the monitoring speakers to
confirm the IP address of DCS.
Press the buttons in order (not release): "Fn" and "CLOSE" one by one, then follow the reverse
order to release button. Please release "CLOSE" button first, then release "Fn".
The device will indicate successful programming with a beep.
The speaker inside the DCS will play the ID voice and announce the IP address.
You cannot perform an inquiry during a broadcast.
Impedance Calibration
If the system needs to supervise the speaker circuits, after installation, please calibrate the
speaker circuit impedance.
Press the buttons in order: "Fn", "MONITOR", and "FAULT" one by one, then release "FAULT"
first, and then release others.
Press the buttons in order (not release): "Fn", "MONITOR", and "FAULT" one by one, then
follow the reverse order to release button. Please release "FAULT" first, then release
"MONITOR", finally release "Fn".
The device will indicate successful programing with a beep.