Mechanical Installation - Siemens milltronics WEIGHFEEDER 1200 Series Instruction Manual

Table of Contents

Advertisement

Mechanical Installation

Perform a thorough and systematic inspection of containers immediately upon receipt of
your weighfeeder. The containers are packed to separate each item and provide
protection during shipping.
Do not remove equipment from shipping crates or boxes until you check for
Note:
possible shipping damage. Contact the carrier immediately if damage is noted.
Your weighfeeder has been designed, assembled, and factory tested for your specific
application.
Notes:
Refer to the mechanical drawings sent with this manual prior to commencing with
installation.
Do NOT weld on or near the weighfeeder while the load cells are connected to
the electronic integrator. Damage to the integrator may result if the load cells are
not disconnected from the integrator.
Follow a scheduled, preventative maintenance program to ensure optimum
performance and long equipment life.
Page 6
Weighfeeder 1200 - INSTRUCTION MANUAL
7ML19985EH02

Advertisement

Table of Contents
loading

Table of Contents