Advertisement

Quick Links

PACKING LIST

Frame
Pre-assembled frame set
Outer pipe
Conection pipe
Control box
Motor
Aluminum extension set
Cable clamp
Screw for Connection pipe, M8x12mm
Screw for Control box, M4x6mm
Column
End pipe
Feet
Rubber washer
Accessory
Handset
AC cable
Hardware
screw for Column, M6x16mm
Screw for Feet, M10x16mm
Screw for Handset, Ø4x22mm
Screw for Tabletop, Ø5x20mm
Allen key for Feet, 5mm
Allen key for Column, 4mm
Allen key for Aluminum extension set, 2mm

TIGHTENING TORQUE

Tailstock
Screw for Column
Screw for Feet and Tabletop
Screw for Handset
Make sure all screws are tightened, also after a period of use!
REST THE DESK BEFORE USE
Press both up and down buttons at the same time for 3 seconds.
Continue pressing the buttons until both columns are in lowest
position. When finish reset, the control box makes a sound and the
buttons can be released. Now the system is operational.
www.timotion.com
©2018 by TiMOTION
pcs
WARNING
Carefully arrange all the cables not to be damaged by tabletop screws.
2

Step 1

2
1
1
1
7
8
2
2
2
2
18
pcs

Step 3

1
1
pcs
8
8
2
x8
18
1
1
1
Maximum 6Nm

Step 4

15-20Nm
Maximum 10Nm
< 6Nm
4A
All rights reserved
TEK05 - ASSEMBLY MANUAL

Step 2

Step 5

4B
x8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TEK05 and is the answer not in the manual?

Questions and answers

Summary of Contents for Timotion TEK05

  • Page 1 TEK05 - ASSEMBLY MANUAL PACKING LIST Frame WARNING Pre-assembled frame set Carefully arrange all the cables not to be damaged by tabletop screws. Outer pipe Step 1 Step 2 Conection pipe Control box Motor Aluminum extension set Cable clamp Screw for Connection pipe, M8x12mm...
  • Page 2 TEK05 - ASSEMBLY MANUAL Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 www.timotion.com ©2018 by TiMOTION All rights reserved...

Table of Contents