E R E C T I O N O F T H E S W I T C H G E A R A T S I T E
5.8 Final erection work
•
Clean the external surfaces of the enclosure
and control cabinets in the switchgear where
necessary and check for any damage to the
paintwork, touching up with a suitable paint if
necessary (see Section 7.3.3)
•
Properly refit any cladding and covers of operating
mechanisms, cable ducts, etc. Removed during
the erection work
•
Remove all tools and other foreign bodies from
the switchgear
•
Check the general condition of the switchgear
•
Check that the areas adjacent to the switchgear
are in the proper condition