E R E C T I O N O F T H E S W I T C H G E A R A T S I T E
Figure 5/1:
Switchgear
assembly
Figure 5/2a:
Switchgear
assembly, see
figures 5/1 to 5/4
for details.
(Multifunction
protection and
switch bay control
unit not shown
completely).
Figure 5/2b:
Switchgear
assembly,
insulating part On
assembly of the
busbar, the conical
surface A is to be
evenly lubricated
with assembly
paste.No areas
must be left
unlubricated!
Figure 5/1
Figure 5/2a
1.20
Socket head screw M 8x25
1.21
Hexagon nut M 8
1.22
Dished washer8
2.5
Plug-in busbar connector
2.14
Ca.50 mm
Figure 5/2b
27