DuraTrel Cottage Trellis 11159 Assembly Instructions

Advertisement

General Information

PLEASE READ THROUGH BEFORE BEGINNING ASSEMBLY.
IMPORTANT: Check boxes for Contents Listed
Check inside of parts as some parts are packaged
inside of others
In the event of missing, damaged or defective parts
please call our customer service dept. at 1-877-258-6020
When assembling components, place on a clean, flat
non-abrasive surface to avoid scratches

Tools Required

... Battery or Electric Drill
... Tape Measure
... Hammer or Rubber Mallet
... PVC, Super, or Crazy Glue
with #2 phillips bit
(recommended)
Cottage Trellis
11159 (M)
Model#
Part #
1
2" sq. x 65" Left Post
2
2" sq. x 65" Right Post
3
⅞ x 1½ x 27½" Top/Bottom Cross Rail
4
⅞ x 1½ x 27½" Center Cross Rail
5
1 x 1 x 58" Vertical Rail
6
2 x 2 x 16" Ground Anchor
7
Hardware Bag
2" sq. Post Cap
¾" Painted Screw
1" Painted Self Tapping Screw
(for ground anchors)
115 Vision Parkway
P.O. Box 122
Sheboygan Falls, WI 53085
Assembly Instructions
Description
(includes:)
1-877-258-6020
www.dura-trel.com
sales@dura-trel.com
Qty
1
1
2
5
3
2
1
2
6
4
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cottage Trellis 11159 and is the answer not in the manual?

Questions and answers

Summary of Contents for DuraTrel Cottage Trellis 11159

  • Page 1 Cottage Trellis 11159 (M) Model# Assembly Instructions Part # Description 2" sq. x 65" Left Post 2" sq. x 65" Right Post ⅞ x 1½ x 27½" Top/Bottom Cross Rail ⅞ x 1½ x 27½" Center Cross Rail 1 x 1 x 58" Vertical Rail 2 x 2 x 16"...
  • Page 2 Warranty Statement 20 Year Guarantee Please call manufacturer direct with questions concerning missing or defective parts at Toll Free: 877-258-6020. Dura-trel, Inc. products are warranted to be free from manufacturing defects resulting in delaminating, peeling, flaking, corroding, cracking, crazing, or extreme amounts of fading or bleaching causing the PVC to change to its natural color for a period of 20 years from the date of purchase.
  • Page 3 Starting at bottom of 65" left post (part 1) insert one 27½" top/bottom cross rail (part 3) and five 27½" center cross rails (part 4) into holes. DO NOT insert remaining top/bottom cross rail into top hole at this time. Insert free ends of cross rails into 65"...
  • Page 4 Figure 2 Figure 1 Trellis Arbor Option 1 (soft ground) Slide one 16 inch ground anchor into bottom of each post. Slide ground anchor up to bottom cross rail. Using two 1 inch self-tapping screws per post, screw the post to the ground anchor (figure 1). When fastening, use one screw on each opposite side as shown in the drawing.

This manual is also suitable for:

Cottage trellis 11159m

Table of Contents