7. Notes for the set-up
Stack should be placed like this
position. Stand on the plastic feet.
Manual_FCS-C100_V2.2_EN
The tube is required to be less than 20cm between stack output
and purging valve. The tube connected to the purging valve
output is required to be less than 30cm. The inner diameter of
the tube is required to be more than 2mm.
Warning: The tube between the hydrogen pressure regulator
and the fuel cell gas input is required to be less than 30cm.
The pressure of the hydrogen is between
0.45--0.55Bar.
The voltage of external power supply is
between 12V-14V, the current range is
different based on the different stack.
T
h
e
o l
a
d
c
o
n
n
e
c
e t
, r
the "load +"in the controller. The load- is
connected to "FC- & Load-" in the stack.
o l
a
d
, +
s i
c
o
n
n
e
c
e t
d
o t
21