Installation And Electric Connection; Installation Of The Hot Or Cold Combiplate (Only Valid For Installation Variants) - Scholl CP 330 Instructions For Use Manual

Built-in hot or cold combiplate for central cooling system
Table of Contents

Advertisement

GBA C 6001 12 E
5.2
I
NSTALLATION AND ELECTRIC CONNECTION
5.2.1 I
NSTALLATION OF THE HOT OR COLD COMBIPLATE
Put your device on a level and safe surface which stands the weight of the device.
Prepare the cut-out of the table according to our installation drawings and check the cut-out. A
silicone gap of 5 mm for wood and stainless-steel buffets all around the unit, and a gap of 7 mm for
stone and Dekton is mandatory. The maximum corner radius shall not be wider than the silicon
gap.
For Dekton (artificial stone) and stone plates please refer to the stone manufacturer's references.
Make sure the surface is free from dust and grease.
Put your hot or cold combiplate into the cut-out. Please make sure that the hot or cold combiplate
fits exactly.
Connect the controller and both cables to the circuit board according to the connection plan.
Locate the hot or cold combiplate in the middle of the cut-out.
Grout the hot or cold combiplate with the silicone which is available in the accessories and remove
the excess silicone.
After a drying time of 24 hrs, you can connect the hot or cold combiplate to the power supply and
start to operate.
NOTE regarding the installation!
The device has to be installed in vertical position.
The hot or cold combiplate has to left in vertical position at least 15 minutes before operation.
The installation variants of the hot or cold combiplates can be built-in flush-mounted or sunk in
every top plate (wood, granite, corean or stainless steel; see installation drawing).
The supply and exhaust air must be ensured for all the plug-in units. The ambient temperature of
30°C mustn't exceed in operation (heat accumulation) because the cooling performance decreases
and the device might get damaged. Please note that warm air rises. Please use parts of the wide
range of built-in accessories like fans or tubes in adverse built-in situations. Referring to this, the
qualified professional can give you some advices.
On-site supply and exhaust air must be taken into account when installing the devices in base
cabinets. The open cross-section for the supply air and exhaust air openings must be at least 200
cm², and the air should be able to flow freely over the cooling unit.
ATTENTION!
The device must be installed by a qualified professional.
BA
Last revised 05-2021
(
ONLY VALID FOR INSTALLATION VARIANTS
Page 16 of 26
)
Mai 5, 2021
Rev. 12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents