Unpacking And Preparation; Electrical Plug Connection - Demtech Pro-Tester Double-Pull Operator's Manual

Table of Contents

Advertisement

5.1

Unpacking and Preparation

a. Before opening the shipping/transport container and unpacking the system, inspect the
outside of the container thoroughly for any signs of mishandling or damage during
shipping. Report any damage to the shipping carrier immediately and do not proceed
with unpacking. Since the shipment is made FOB factory, you should consult your
administration concerning claims for shipping damage. Please notify DEMTECH
Services, Inc. immediately in writing of any shipping damage.
b. Unlatch and open the shipping/transport container lid and inspect inside the container
and equipment thoroughly for any signs of mishandling or damage during shipping.
Report any damage to the shipping carrier immediately and do not proceed with
unpacking. Since the shipment is made FOB factory, you should consult your
administration concerning claims for shipping damage. Please notify DEMTECH
Services, Inc. immediately in writing of any shipping damage.
c. Make note of the orientation of the equipment and packing foam inserts inside the
shipping container to facilitate any repackaging requirements in the future.
d. To avoid injury and/or damage to the system, be sure to use adequate care when lifting,
removing or replacing the system into the shipping/transport container.
e. You may operate the system from within the shipping/transport container or remove it
and place it in an appropriate location suitable for the testing you intend to perform.
5.2

Electrical Plug Connection

a. Verify proper operation of the Pro-Tester
installation. The Pro-Tester
utilizes a toggle power switch on the rear of the system. Toggle the switch up to turn
the system ON. Toggle the switch down to turn the system OFF. This feature provides
a built in safety to protect the system during connection to a field generator by
automatically turning the power off to the system any time AC power is disconnected
either by turning off the generator or unplugging the power cord. Upon startup
generators can produce significant power surges which can be harmful to the Pro-
Tester
TM
. This soft-start feature eliminates ill effects from this phenomenon. Find the
Power Cord included with your system and plug one end into the appropriate connecter
at the rear of the system (refer to Figure 1). Plug the other end into an electrical outlet
supplying the proper ~(AC) power. Toggle the Power Switch to the ON position (refer
to Figure 5.1).
Page 5
TM
before proceeding with the remainder of the
TM
is equipped with a "soft-start" feature. This feature
Rev. C, October 2020
Pro-Tester Operator's Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-0100/a

Table of Contents