  • Page 1 Pro-Tester SE Pro-Tester SE Operator’s Manual Model Number: T-0100SE/A Revision: B...
  • Page 2 DEMTECH Services, Inc. developments. The material in the manual is for informational purposes only and is subject to change without notice. DEMTECH Services, Inc. assumes no responsibility for any errors that may appear in this manual. Printed in the USA Manual Number: T-OPERATOR’S MANUAL/PRO-TESTER SE, Revision: B...
  • Page 3: Table Of Contents

    Settings……………………………………………………………………….Page 10      Elongation Definition………………………………………………………...Page 10      FACTORY SERVICING…………………………………………………...PAGE 13     USER INTERFACE MENU TREE………………………………………..PAGE 13     SYSTEM WIRING DIAGRAM……………………………………………PAGE 14     PRO-TESTER HI-PULL WARRANTY…………………………………PAGE 14       Pro-Tester SE Operator’s Manual Page iii...
  • Page 4: Safety Precautions

    (ESD) sensitive Printed Circuit Boards (PCB’s). Assume that all PCB’s are sensitive to potential damage from ESD. CAUTION 4: Unauthorized personnel should not remove from the equipment those panels or covers that are provided for protection and/or require a tool to remove. Page 1 Pro-Tester SE Operator’s Manual...
  • Page 5: General Safety & Maintenance Information

    Before removing or installing spare parts or performing other repair operations to the tensiometer, consult DEMTECH Services, Inc. or your authorized DEMTECH service center for advice on proper procedures. This will help insure a safe and successful outcome. Always make sure all screw connections are tight before attempting to operate the welder after maintenance and/or repair procedures.
  • Page 6: General Product Data

    Billet Aluminum and ground and hardened steel. DEMTECH Services, Inc. strives to make our systems easy to use and built to last. Just like all other DEMTECH Services, Inc. products, even a first-time user will be productive in minutes. With easy adjustments and a one touch operation, you will be getting test results within minutes of installation.
  • Page 7: Site Preparation

    Note: The system illustrated in this manual shows ALL available features for the Pro- Tester , therefore, your system may vary slightly in appearance from that depicted. Pro-Tester SE Operator’s Manual Page 4...
  • Page 8: Unpacking And Preparation

    Report any damage to the shipping carrier immediately and do not proceed with unpacking. Since the shipment is made FOB factory, you should consult your administration concerning claims for shipping damage. Please notify DEMTECH Services, Inc. immediately in writing of any shipping damage.
  • Page 9 If the system does not perform any of the functions described above please contact DEMTECH Services, Inc.   Power ON/OFF Switch Fuse Holder Power Cord With IEC 60320 Connector (P/N T-111) M002 Figure 5.1 Pro-Tester SE Operator’s Manual Page 6...
  • Page 10: Control Panel

    Control Panel The User Interface Control Panel is the main operator interface device for operating the Pro-Tester . Each component of the Control Panel is identified below (refer to Figure 5.3).                                                        Figure 5.3 Page 7 Pro-Tester SE Operator’s Manual...
  • Page 11 Return Enter: This button is used to return the grips after a test or in Menu Mode to navigate the screen tree. f. Stop/No/⇩: This button is used to stop a Test or in Menu Mode to navigate the screen tree. Pro-Tester SE Operator’s Manual Page 8...
  • Page 12: Loading Samples

    The stop tabs will need to be removed in order to load a 4” (100 mm) coupon. Stop T-035 A M004 Figure 5.4 Page 9 Pro-Tester SE Operator’s Manual...
  • Page 13: Settings

    (is squeezed) out from between the pressure zone of the welding tool and then cools. This extruded material does not usually provide an acceptable bond of the parent material and should not be considered part of the weld (refer to Figure 6C). Pro-Tester SE Operator’s Manual Page 10...
  • Page 14 It is on this basis that the Pro-Tester has been designed and programmed to operate when performing elongation testing.                           T-035 A M004     Figure 5.5 Page 11 Pro-Tester SE Operator’s Manual...
  • Page 15 Rev. B, October 2020           Figure 6A Figure 6B Figure 6C Figure 6 Pro-Tester SE Operator’s Manual Page 12...
  • Page 16: Factory Servicing

      In the event your Pro-Tester SE should require factory service, the entire welder needs to be returned to the factory. Refer to the following step for preparing the Pro-Tester SE return. Carefully pack the Pro-Tester SE in the reusable portable shipping/storage case provided with the welder for return to DEMTECH Services, Inc.’s factory for service.
  • Page 17: System Wiring Diagram

    System Wire Diagram. This drawing can be very helpful in identifying and/or troubleshooting basic wiring or interconnection issues related to the Pro-Tester 9 Pro-Tester SE Warranty See page 17 for the DEMTECH Services, Inc. product warranty.   Pro-Tester SE Operator’s Manual Page 14...
  • Page 18 Rev. B, October 2020 Figure 7.1 Page 15 Pro-Tester SE Operator’s Manual...
  • Page 19 Rev. B, October 2020 Figure 8.1 Pro-Tester SE Operator’s Manual Page 16...
  • Page 20 At DEMTECH Services, Inc.'s option, a service representative may be dispatched to the equipment location. As an additional protection, DEMTECH Services, Inc. warrants that for a period of 90 days from the date of shipment to the original buyer, pending prior authorization from DEMTECH Services, Inc., there will be no charge for service related shipping of parts and/or equipment or for authorized travel of a service representative to the equipment location.