Download Print this page

Dell 6350 Rack Installation page 28

Dell poweredge 6350 servers: install guide
Hide thumbs Also See for 6350:

Advertisement

1-14
Dell PowerEdge 6x50 Systems Rack Installation Guide
captive
thumbscrew
  '  + $  *
2.
Insert the free end of the cable-management arm (the end with the captive
thumbscrew) into the slotted pocket (formed from three metal tabs) on the back
of the computer.
Secure the cable-management arm in its slotted pocket with the captive
thumbscrew.
3.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the PowerEdge computer.
4.
Connect the remaining cables to the computer.
For connection details, see your computer's Installation and Troubleshooting
Guide and the User's Guide.
5.
Secure the cables to the cable-management arm.
6.
After connecting the cables to the computer, unscrew the thumbscrews that
secure the front of the server to the front vertical rail.
7 .
Slide the computer forward to the fully extended position.
captive
thumbscrew

Advertisement

loading

This manual is also suitable for:

Poweredge 6450Poweredge 6x50