Restore Language Setting via HMI, Buttons and Softkeys ............22 Amendments Created Amendments Name 2019-10-16 Creation Twesten 2020-05-25 Layout adjustment Twesten 2020-09-17 Implementation of QR Code Twesten BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 2 von 23 Datum: 17.Sep.2020...
15 ETHERNET interface (RJ-45) LAN B CAN bus interface CAN #2 16 ETHERNET interface (RJ-45) LAN A CAN bus interface CAN #3 CAN bus interface CAN #1 BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 3 von 23 Datum: 17.Sep.2020...
Page 4
Opening USB connection to the KEA 3X0 offers read access to the files listed below but with status "delivery" - please be aware that this files are not updated. Please contact Kuhse for the latest versions.
Page 5
KEA 350 P2 / KEA 350 RP-P2 Files stored at KEA 3X0 device: – Configuration – msi-file (installing application files and ToolKit) – eds-file (zipped) – Documentation – Technical Manual (PDF) BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 5 von 23 Datum: 17.Sep.2020...
The Protective Earth terminal 61 is not connected on the sheet metal housing. Use the protective earth (PE) connector located at the bottom center of the sheet metal housing instead. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 6 von 23 Datum: 17.Sep.2020...
Page 7
User Manual KEA 350 P2 / KEA 350 RP-P2 Fig. 6: Wiring diagram 1(2) KEA 350 RP-P2 / KEA 350 P2(-LT) Pin 61: Metal housing: don´t use; Plastic housing with HMI/display: Earth/ground BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 7 von 23 Datum: 17.Sep.2020...
Page 8
User Manual KEA 350 P2 / KEA 350 RP-P2 Fig. 7: Wiring diagram 2(2) KEA 350 RP-P2 / KEA 350 P2(-LT) BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 8 von 23 Datum: 17.Sep.2020...
The main screen can be divided into the following basic sections: Fig. 8: Main screen 1 Values 2 Status Messages 3 Alarm Messages 4 Single Line Diagram 5 Current Softkey Functions BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 9 von 23 Datum: 17.Sep.2020...
Page 10
Customer configurable Change to "customer specific screen 1 (or 2)" screen 1 (and 2) Notes The name of this softbuttons is configurable, too. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 10 von 23 Datum: 17.Sep.2020...
Page 11
Return Return to previous menu. Next Page Go to following page/screen of the current menu. Parameter Screen Show parameter screen. Alarm Screen Show alarm screen. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 11 von 23 Datum: 17.Sep.2020...
Page 12
The bit is enabled (CAN Interface). Relay activated (Discrete Outputs) Variable is FALSE (LogicsManager). FALSE/disabled The bit is disabled (CAN Interface). Relay deactivated (Discrete Outputs) BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 12 von 23 Datum: 17.Sep.2020...
163/ p. 1038. Result is available as logical command variable 11924 p. 1017/ p. 1028 (and can be used with 86.30). Find menu (ToolKit only!): “Parameter Configure HMI Configure display” BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 13 von 23 Datum: 17.Sep.2020...
Page 14
Operating hours (h) Battery voltage (V) Fuel level (%) Generator/LS-5 - Generator values as described above and additionally for LS-5 - Voltage - Power - Frequency BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 14 von 23 Datum: 17.Sep.2020...
Access via PLC depends on the interface and the data telegram used for communication. For menu structure/menu tree see “Menu structure (menu tree)” on page 110. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 15 von 23 Datum: 17.Sep.2020...
- the red bar at the bottom monitors the degree of fulfillment HOME screen appears with the same measured values and state information as before power cycling ... starting metal housing version BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 16 von 23 Datum: 17.Sep.2020...
In operating mode STOP neither the engine nor the GCB can be operated. Dependent on the application mode the power circuit breakers cannot be operated. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 17 von 23 Datum: 17.Sep.2020...
Page 18
If the conditions of the LogicsManager function "Enable MCB" (parameter 12923 p. 263/ p. 1038) are TRUE, the MCB will be closed again if it is open in STOP operating mode. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 18 von 23 Datum: 17.Sep.2020...
Success: The engine stops and the circular arrow and the eye symbol disappear. Failure: No change in the display until the "stop failure" message appears. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 19 von 23 Datum: 17.Sep.2020...
Page 20
Close the GGB Open the MCB Close the MCB The GGB can not be operated via softkey. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 20 von 23 Datum: 17.Sep.2020...
No shut down alarm is present. (for explanation of the alarm classes refer to Chapter 9.5.1 “Alarm Classes” on page 1078). The engine is ready for operation. The GCB is open. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 21 von 23 Datum: 17.Sep.2020...
The main functions are briefly described in the following sections. Restore Language Setting via HMI, Buttons and Softkeys In order to change the language setting via HMI, press the (soft)keys in the following order: BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 22 von 23 Datum: 17.Sep.2020...
Page 23
Press softkeys [11] or [12] to select the desired language. Press softkey [7] once to commit the language setting. The desired display language is restored. BA-KEA 350 P2 / KEA 350 RP-P2_EN Version 03 Seite 23 von 23 Datum: 17.Sep.2020...
Need help?
Do you have a question about the KEA 350 P2 and is the answer not in the manual?
Questions and answers