Summary of Contents for SJC brands tasman Essentials Joey
Page 1
Avoid scourers and steel wool as these will damadge the finish. Always dry the cot after cleaning. Save the instructions for future reference. Assembly of this furniture is best undertaken by two people. SJC Brands Pty Ltd abn. 58 106 988 578 w.www.tasmaneco.com.au Packaging and instructions 4-6 Merryvale Rd, Minto, NSW 2566 p.o.
Page 2
· Re-tighten all connector bolts (at least two months after assembling the cot), as some may loosen as the cot settles. Regulary check all of the connecting bolts, making sure they are tight. · Regularly check cot for weakness in panels joints and panels. If any weaknesses are found, report immediately to SJC Brands via: www.tasmaneco.com.au ·...
Page 3
M6 x 60mm Bolt x 4 Metal cross dowel x 4 M6 x 15mm Cap screw x 4...
Page 4
Attach the sides to headboards secure with M6 x 60mm bolts and metal cross dowels. M6 x 60mm Bolt x 8...
Page 5
M4 Bolt x 4 M3 Allen key x 2 M4 Cap screw x 4 M4 Allen key x 1...
Page 6
2. There is damage to the product and that damage is deemed by SJC Brands Pty Ltd to be caused by incorrect assembly, misuse or by use or storage outside of the physical or environmental speci cations of the product.
Need help?
Do you have a question about the tasman Essentials Joey and is the answer not in the manual?
Questions and answers