Power On (Ac Power); Power Failure (Ac Power); Installing The Power Cord Clip - D-Link DGS-1510-10L/ME Hardware Installation Manual

Dgs-1510/me series, metro
Table of Contents

Advertisement

DGS-1510/ME Series Metro Ethernet Switch Hardware Installation Guide
Figure 2–4 Inserting an SFP+ transceiver into an SFP+ transceiver port
For a full list of supported transceivers, compatible with switches in this series, refer to Port Functions on page 41.

Power On (AC Power)

Plug one end of the AC power cord into the AC power port of the Switch and the other end into the local power source
outlet. After the system powered on, the LED's will blink green to indicate that the system is booting up.

Power Failure (AC Power)

In the event of a power failure, just as a precaution, unplug the power cord from the Switch. After the power returns,
plug the power cord back into the power port of the Switch.

Installing the Power Cord Clip

To prevent the accidental removal of the AC power cord, it is recommended to install the power cord clip together with
the power cord.
1. With the rough side facing down, insert the Tie Wrap into the hole below the power socket.
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents