Download Print this page

JVC GR-D23EK Service Manual page 91

Advertisement

2.2.3 DISASSEMBLY/ASSEMBLY PROCEDRURE TABLE
This procedure starts with the condition that the cabinet parts and deck parts. Also, all the following procedures for adjustment and
parts replacement should be performed in STOP mode. When reassembling, perform the step(s) in the reverse order.
STEP/LOC.
No.
[1]
ROLLER BASE ASSY
[2]
TENSION ARM ASSY
[3]
REEL DISC
[4]
SLANT ARM ASSY
[5]
CANCEL LEVER ASSY
[6]
EJECT LEVER ASSY
[7]
CASSETTE GUIDE (LEFT)
[8]
SUPPLY CLUTCH ASSY
[9]
WHEEL GEAR
[10]
ROTARY ENCODER
[11]
TIMING BELT
[12]
CENTER PULLEY UNIT
[13]
CASSETTE GUIDE (R) ASSY
[14]
TAKE UP GEAR
[15]
BRAKE SUB GEAR
[16]
PINCH ROLLER ARM ASSY
[17]
TAKE UP GUIDE ARM ASSY
[18]
LINK ARM ASSY
[19]
LED GUIDE
[20]
A/C HEAD UNIT
[21]
SLANT POLE BASE ASSY
[22]
CAPSTAN MOTOR
[23]
MOTOR BASE
[24]
BRUSH
[25]
DRUM FINAL ASSY
[26]
GUIDE RAIL
[27]
POLE BASE (S)ASSY
[28]
POLE BASE (T)ASSY
[29]
COVER PLATE
[30]
DRIVE LEVER ASSY
[31]
MOTOR BRACKET ASSY
[32]
CONTROL CAM
[33]
LINK LEVER
[34]
MIDDLE GEAR
[35]
LOADING GEAR(T) ASSY
[36]
LOADING GEAR(S) ASSY
[37]
LOADING RING ASSY
2-22 (No.86700)
FIG.
PART NAME
T
T
T
T
T
T
T
T
T
B
B
T/B M3
T
T
T
T
T
T
T
T
T
T
T
B
T/B M6
T
T
T
T
T
T
T
T
T
T
T
T
Fig.2-2-1
REMOVAL
POINT
M1
(1)
M1
(P1), (W1a)
M1
(W1a), (W1b)
M1
(W1a)
M2
(W2)
M2
(W2)
M2
(2)
M2
(W2)
M2
(W2)
M3
4(S3a)
M3
2(S3a)
M3
(S3b), (P3)
M3
(W3a)
M3
(W3a)
M3
(W3b)
M3
(W3a)
M4
(W4)
M4
(S4a)
M4
2(S4b)
M5
(S5a)
M5
3(S5a)
M5
2(S5b), (S5c)
M6
(S6a)
2(S6b), 2(S6c) *CATCHER
M6
7(S6d), 8(S6d)
M6
M6
M7
M7
M7
3(S7)
M8
(W8a)
M8
M8
M8
(W8b)
M8
(W8b)
M8
4(S8)
INSTALLATION
ADJUSTMENT
CONDITION
NOTE
See, Adjustment procedure for
Section 2.2.5
The function of this part varies according
to the ASSY
(VHS/SVHS) which this
part is rporated in.
(Refer to fig. 2-2-6)
(Only use SVHS model)
(Refer to part list.)
See, Adjustment procedure for
Section 2.2.5
See, Adjustment procedure for
Section 2.2.5
See, Adjustment procedure for
Section 2.2.5
See, Adjustment procedure for
Section 2.2.5

Advertisement

loading