Download Print this page

Toro Multi Pro 41118 Operator's Manual page 4

Hand spray wand kit

Advertisement

Note: Squeeze the 2 legs of the retainer together while
pushing it down.
Note: Retain the actuator and retainer.
Figure 3
1. Actuator
2. Retainer
2. Remove the actuator from the manifold valve.
3. Remove the retainers holding the bypass adjustment
assembly, end cap, and the fitting and hose assembly as
shown in
Figure
4.
Note: The end cap will not be used but keep the
O-ring that is on the cap.
Figure 4
4. Rotate the bypass adjustment assembly 180 degrees as
shown in
Figure
5.
3. Stem port
1. Boom valve cluster
5. Install the bypass adjustment assembly, female cap,
O-rings, shutoff valve, and fitting and hose assembly
using the retainers previously removed as shown in
Figure
6.
1. Female cap
4
Figure 5
Figure 6
2. Shutoff valve

Advertisement

loading

This manual is also suitable for:

Multi pro 315000001