Assembling The Heater; General Information - Ferroli SKY ECO C Instructions For Use, Installation And Maintenance

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 34
2 INSTALLATION MANUAL

2.1 General information

The heater may only be installed by an authorized technician, in
accordance with all instructions contained in this manual, standard
UNE 26, and local installation and exhaust regulations.
2.2 Location
The unit is equipped with an "open chamber" combustion circuit, and can therefore only be
installed and operated in rooms with permanent ventilation. Nonetheless, the installation
site must be sufficiently ventilated to avoid hazardous situations in the event of a gas leak.
European directive 90/396/EEC establishes this safety standard for all gas-powered
appliances, including those with a sealed chamber. An insufficient supply of combustion
air to the heater compromises normal operation and exhaust. In addition, the combustion
products that form under such conditions are very harmful to health in a domestic
environment.
In any case, the unit must be installed in a location free of dust, flammable objects or
materials, or corrosive gases.
The unit may be installed on a wall. Attach it to the wall in accordance with the dimensions
indicated in section 4.1. The wall installation must be firm and stable.
If the unit is installed inside a cabinet or joined laterally to other elements,
space must be allowed for removing the casing and performing normal
maintenance activities.
A
A
A - On each
side
> 2 cm
B
> 50 cm
C - In front > 2 cm
36
ENG
B
code A73022200

2.3 Assembling the heater

Before assembling the heater, make sure the water and gas connections
are properly secured, identified, and positioned.
See the dimensions and connections in section 4.2.
1 - Open the packaging, and you'll find an assembly template for the unit inside. Place it
on the wall at the appropriate height (be sure to observe the distances described in
the previous section), and make sure the template is as horizontal as possible (using
a level).
2 - Mark the position of the attachment holes.
3 - With a drill and Ø8 mm bit, make the holes and insert the expansion plugs.
4 - Insert the fastenings to be used to attach the unit.
fig. 5 - Assembly template
5 - Remove the unit from the packaging.
6 - Verify all documents.
7 - Remove the plugs from the water and gas connections (see fig. 7).
8 - On the rating label, check the destination country reference and the type of gas for
which the unit is supplied.
SKY ECO C

Advertisement

Table of Contents
loading

Table of Contents