18. Open the drop-down menu and select ACE.
19. Select the box with the ampere level, underneath the start and
stop buttons, to set your ACE threshold. Ferroamp
recommends setting this value to 75% of your main fuse.
20. Enter your threshold value and press the green check mark.
21. Press the green start button to start the configuration.
22. When configuration is done the following view is shown. ACE
functionality is now activated.
23. Exit the service menu by pressing the middle of the screen for
5 seconds until the text "Service menu disabled" is displayed.
24. Go through all check points in the installer verification under
the section after commissioning. Sign the document before
proceeding.
25. Commissioning is now completed! To register the system in
the Ferroamp EnergyCloud follow the instructions in the
EnergyCloud registration booklet.
NOTE!
A successful CT-configuration is necessary for the system to
function properly. If the configuration has not succeeded the
measured values that are reported to the system will be unreliable.
2 EnergyHub + SSO
NOTE!
Ferroamp recommends that the installer creates a
schematic document over the SSO installation that describes the
location of each SSO using the unique serial number marked on the
side of the SSO.
1.
Make sure that the DC breaker that disconnects your SSOs
from the DC nanogrid are open (for ex. a Power Distribution
5/8/15).
2.
Follow steps 1 to 17 in section 1 EnergyHub. When done
proceed with the following instructions.
3.
Measure the DC voltage by the DC breaker that disconnects
your SSOs, this must be done on all your DC distribution boxes
that connect units to the DC nanogrid:
a.
Check that the polarity is correct (L+ and L-) and the
voltage is in the range 585–780 VDC.
4.
If polarity and voltage is correct go ahead and turn on the DC
breakers.
5.
Go back to the EnergyHub and press the reset button, this
initiates the SSO detection:
a.
EnergyHub Wall & XL Single: The reset button is
located at the bottom of the EnergyHub next to the
connections.
b.
EnergyHub XL Cabinet: Press the reset button at the
back of the master unit, by default the bottom unit
shipped inside the cabinet (if you don't know which
unit is the master you can reset all the XL modules).
6.
Wait for the display to boot up.
7.
Enter the service menu and swipe to the SSO status view.
8

Advertisement

loading

Related Products for ferroamp EnergyHub system