ferroamp EnergyHub Installation And User Manual

Hide thumbs Also See for EnergyHub:

Advertisement

Quick Links

EnergyHub System
Installation and user manual
Revision 3, 2017-03-16

Advertisement

Table of Contents
loading

Summary of Contents for ferroamp EnergyHub

  • Page 1 EnergyHub System Installation and user manual Revision 3, 2017-03-16...
  • Page 2 • The warranty is not applicable if the products has been modified. • Observe, the EnergyHub equalizes imbalance between the phase conductors and uses the systems neutral conductor. Large imbalance causes large currents in the neutral conductor. • The DC contact shall not be connected when the EnergyHub is powered up.
  • Page 3: Table Of Contents

    5. Internet connection ........................10 6. EnergyHub Connections ......................10 7. Commissioning ......................... 11 8. DC connection .......................... 12 9. Example of an EnergyHub system ..................13 Schematic Wiring diagram ....................14 User manual ............................. 15 Activate ACE and solar production ..................15 Change ACE limit ........................
  • Page 4: Introduction

    Introduction The EnergyHub is an inverter for the modular solar power systems, with new features. The EnergyHub does not only convert direct current from PV-panels to alternating current, but can also be used around the clock as an active electricity meter.
  • Page 5 DC nanogrid The EnergyHub can be used with PV-panels and/or Energy Storage in order to utilize renewable, locally produced, energy. This is enabled through the optimizers as they work as DC/DC converters for solar power and Energy storages. The EnergyHub works as a bidirectional bridge between the DC nanogrid, created by the optimizers, and the AC grid inside the facility.
  • Page 6: Energyhub

    EnergyHub Products EnergyHub 7 or 14 kW Mounting plate, wall. 3 current sensors with 10m connection cables. Contact Ferroamp for other sizes. Contact for current sensors Contact for DC grid connection Five pole three phase contact for AC grid connection...
  • Page 7: Location Of The Energyhub

    Location of the EnergyHub • Make sure there is enough space around the EnergyHub to enable a safe installation and steady airflow. • Mount the EnergyHub indoors or in a suitable enclosure with sufficient ventilation. • The wall and fasteners needs to be able to carry at least 25 •...
  • Page 8: Current Sensor Installation

    Current sensor installation • There are 3 available current sensors. The size of the current transformer is decided of the current flowing through the cable and its physical size. < 100 A, ratio 2000 < 160 A, ratio 4000 < 600 A, ratio 6000 Page 7 of 19...
  • Page 9 See wiring diagram in section 4 • The EnergyHub has an automatic calibration for each of the current sensors which handles the current direction and phase. • Observe. In order to facilitate the analysis and identifying different loads in the facility the sensor marked with 1 should be connected to L1, 2 with L2 and L3 with 3 •...
  • Page 10: Connection To Distribution Board

    EnergyHub. The connection cable for the EnergyHub needs to be able to handle the heat that may occur. E.g. for an EnergyHub with 20 A ACE the current in the neutral conductor can be 34 A...
  • Page 11: Internet Connection

    Internet connection • The EnergyHub requires Internet connection in order to present data on the Ferroamp portal and receive software updates EnergyHub Connections Page 10 of 19...
  • Page 12: Commissioning

    Commissioning • Start the EnergyHub by turning on the disconnect switch on the AC side. • Wait 1 minute for the display to start. • Press the display until “Service menu enabled” shows to enter the setup menu. • When the finger is removed the “Start and Stop” view is shown. If it fails, please try again without moving the finger.
  • Page 13: Dc Connection

    DC connection • Ensure that the EnergyHub is turned off. Do not connect the DC grid contact if the EnergyHub is powered on. • Connect the cables to the 3-pole DC contact as shown below. Please note the order of the cables.
  • Page 14: Example Of An Energyhub System

    • 3Gx1.5 mm cables, between the SSO and distribution board • 3Gx6 mm cable, between the distribution board and EnergyHub 14 kW • 4x10 A DC rated fuses • 1 disconnect switch rated for 20 A and 1000 VDC Page 13 of 19...
  • Page 15: Schematic Wiring Diagram

    Schematic Wiring diagram Page 14 of 19...
  • Page 16: User Manual

    User manual 1. Activate ACE and solar production • Press and hold the display until “Service menu enabled” is shown • Swipe to the “start and stop” display. • Choose “ACE & PV” in the drop-down menu • Set the current limit where the ACE function should start. (Normally the rating of the main fuse) •...
  • Page 17 • Grid current shows the current over the main fuse • Load current shows the current inside the facility • When ACE is activated, the transferred currents is shown by the arrows between the phases. Page 16 of 19...
  • Page 18 4. Activate ACE only • Press and hold until “Service menu enabled” is shown. • Swipe to the ”Start and Stop” display. • Choose “ACE only” in the drop-down menu • Choose the current limit that triggers the ACE function •...
  • Page 19: Activate Solar Production

    5. Activate Solar production • Press and hold until “Service menu enabled” is shown. • Swipe to the ”start and stop” display. • Choose “PV only” in the drop-down menu • • • Press Start • Verify the status at the table view •...