ferroamp EnergyHub XL Installation Manual

Cabinet 24u & 42u, 28-140 kw
Hide thumbs Also See for EnergyHub XL:
Table of Contents

Advertisement

Available languages

Available languages

Quick Links

Installation manual
EnergyHub XL
Cabinet 24U & 42U
28-140 kW
Rev B01

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EnergyHub XL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ferroamp EnergyHub XL

  • Page 1 Installation manual EnergyHub XL Cabinet 24U & 42U 28-140 kW Rev B01...
  • Page 3: Table Of Contents

    Mounting and connecting EnergyHub XL units ..........................13 Revision history Date Revision 2020.11.05 B01–Swedish and English version PN: PD01294, Copyright Ferroamp Elektronik AB 2020. Document subject to change without prior notice. Verify that you have the latest version of this manual on our website. www.ferroamp.com/downloads...
  • Page 4: Svenska

    Utropstecknet i en liksidig triangel är avsedd att varna användaren om att vårdslöshet av denna information kan vara livshotande! Ingående artiklar Följande artiklar ingår vid leverans av en EnergyHub XL Cabinet: Utropstecknet i en cirkel är avsett att informera Artikel Antal användaren om att försummelse av denna...
  • Page 5: Komponenter

    Komponenter Anslutningar NOTERA! Varje skåp skickas med en EnergyHub XL-modul Distributionsblock 42U: monterad i botten. Denna enhet är skåpets master-enhet och är den enheten som styr de andra modulerna. Se till att master-enheten alltid är placerad längst ned i skåpet, var noga med att sätta tillbaks den på...
  • Page 6: Installation

    XL Cabinet. 2 Installation Installationsavsnittet kommer att ta dig genom hela processen steg för steg för hur du ska installera en EnergyHub XL Cabinet. NOTERA! Ferroamp tar inte ansvar för skador som åsamkas produkten på grund av felaktig eller vårdslös installation.
  • Page 7: Kabeldragning

    Kablarna kan dras in i skåpet genom skåpets topp eller botten. Dra alla kablar innan du monterar och installerar EnergyHub XL- modulerna. Lyft ur EnergyHub XL-masterenheten och ta av skåpets sidoväggar för att förenkla kabeldragningen samt få bättre åtkomst till anslutningar vid distributionsblocket.
  • Page 8: Strömtransformatorer (Ct) - Anslutning Och Placering

    LED-indikatorerna. Tillse att täckningen för 4G- 0,50 modemet är tillräcklig (endast 4G USB-modem tillhandahållna av 0,75 ferroamp stöds). Anslut CT-kabeln till kopplingsplinten enligt följande bild (röd/svart/grön - vit/blå/gul). Följande krav gäller för internetanslutningen: IPv4-adress samt fungerande DNS-server och NTP-server •...
  • Page 9: Placering Och Anslutning Av Energyhub Xl-Moduler

    Placera masterenheten på plats längst ner i skåpet, position tas bort utan verktyg. XL 1. Fyll upp skåpet med den mängd EnergyHub XL-enheter du har beställt. Fäst varje XL-enhet på framsidan med fyra skruvar. Anslut alla förmonterade kablar enligt figuren på baksidan av skåpet.
  • Page 10: English

    The flash symbol in an equilateral triangle warns of dangerous voltage. In this booklet you will find installation instructions for your EnergyHub XL cabinet. Please read the instructions carefully to ensure that no unnecessary errors occur. The exclamation mark in an equilateral triangle is...
  • Page 11: Components

    Components Connections NOTE! Each cabinet is shipped with one EnergyHub XL module at Distribution block overview 42U: the bottom. This unit is the system master and is controlling all the other EnergyHub XL modules. To ensure consistency among installations the master unit must be placed at the bottom of the cabinet, if removed during the installation make sure to place it back in the correct position.
  • Page 12: Installation

    The electrical installation must be carried out by a qualified installer and in accordance with it is recommended to remove the EnergyHub XL master unit, that the applicable electrical standard. is shipped inside the cabinet, before moving the cabinet. It is •...
  • Page 13: Cabling

    2,5 - 16 Connection to facility distribution board 25 - 35 Connect the EnergyHub XL Cabinet to the building’s electrical 50 - 70 distribution board according to the figure below. Section of 24U cabinet with 125A fuses and the 42U with 250A fuses.
  • Page 14: Current Transformers (Ct) - Connection And Placement

    If you are using a 4G USB modem, connect it to the USB port located below the LED indicators. Make sure the coverage for the 0,16 4G modem is adequate (only 4G USB modems provided by ferroamp 0,25 are supported).
  • Page 15: Mounting And Connecting Energyhub Xl Units

    They should not be removable without a tool. position XL 1. Fill up the cabinet with the amount of EnergyHub XL units you have ordered. Secure each XL unit in the front with 4 screws. In the rear side of the cabinet, connect all pre-mounted cables according to figure.
  • Page 16 Electricity. Reinvented.

Table of Contents