Kit Contents - Toro RECYCLER 59291 Installation Instructions Manual

Mower side discharge kit
Table of Contents

Advertisement

Available languages

Available languages

Kit Contents

DESCRIPTION
Discharge Plug Assembly
Discharge Tunnel Assembly
Screw, hex washer head
Screw, self-tapping
Grommet
Side Discharge Chute
Installation Instruction Sheet
Assembly
Install Discharge Tunnel
1.
Remove spark plug wire from spark plug.
2.
Remove and save the (4) bolts securing the
discharge cover to the deck (Fig. 1). Save the
cover and (4) bolts for possible future
reinstallation.
2
1
Figure 1
1. Discharge cover
2. Bolt (4)
EN–2
QTY.
1
1
4
1
4
1
1
3
2008
3. Screw and nut
3.
Remove screw and nut from side hole of mower
deck (Fig. 1). Save for reuse if cover is ever
reinstalled.
4.
Install (4) grommets supplied in kit into four
square holes in mower deck (Fig. 2).
1
Figure 2
1. Grommet (4)
5.
Insert tongue of discharge tunnel assembly into
deck. Align holes in tunnel assembly with holes
in deck (Fig. 3). Be sure hole in tongue aligns
with hole in side of deck (Fig. 3).
1
2
Figure 3
1. Discharge tunnel
assembly
2009
3
2010
2. Tongue
3. Self-tapping screw

Advertisement

Table of Contents
loading

Table of Contents