Do you have a question about the GBLI 6532 and is the answer not in the manual?
Questions and answers
Simon Holland
May 16, 2025
Please ignore last message. Fault code BMS error 319 sent from inverter KVM0CLN0ED in respect of battery system GBLI6532. What does this mean? Data log serial number is GPG0CLT1C3
Simon Holland
May 16, 2025
Fault Code 301 recorded stating it's a BMS fault. What is the implication of this? My system commenced working on the 27th January 2025.
Page 2
Revision Contents Drafter Reviewer Version Date Chen Le Shen Zhengbin V1.0 2020-07-24 Li Bing Guo Yihao Added the icon “read the manual Wang Qian Shen Zhengbin V2.0 2020-08-30 before operating” Guo Yihao Updated the caution about the Ni Yunlong two-pole breaker...
Table of Contents This document describes the application scenarios, installation, 1 Safety ....................1 electrical connection, commission and troubleshooting of 6.5kWh 1.1 Warning Label ................1 Residential Energy Storage Battery (hereinafter simply put as battery). 1.2 Precautions ................2 Before installing and operating battery, please ensure that you are 1.3 Responses to Emergencies ............2 familiar with product features, functions, and safety precautions as 1.4 Storage safety ................3...
1 Safety 1.1 Warning Label Do not reverse polarities. Do not dispose battery in household trash. Do not expose battery to flame. Recyclable. Operate as specified by the manual. Certification in European Union area. Read this manual before operating. Risk of electric shock. Explosive gas.
Label Risks of damage * Keep a distance to water source. * Do not subject battery to high voltage. WARNING AVERTISSEMENT * Place battery on a flat surface. Do not place any foreign objec t 1. Do not disassemble or alter the battery in any way. Ne démontez ni modifiez la batterie en aucune façon.
1.4 Storage safety * Place battery according to signs on packing case. * Do not pile up foreign objects on the top of battery. Four batteries * Do not put battery upside down or sidelong. at most can be piled up. *...
2. Introduction to Product Breakers are provided by your system supplier. 2.1 Intended Purpose The quantity of breakers must be consistent with that of the battries. The battery is a 6.5kWh LiFePO4 pack. It has a 48V battery module as 2.2 Function the main power supply unit which composed of 32 pieces of 64Ah cells Compared with normal batteries, the battery is characterized with...
3 Installation Please follow the AS/NZS 5139 standard during the battery installation. Do not place the battery upside down nor keep it flat as above. 3.1 Basic Installation Requirements Battery can be installed indoors or outdoors. Ensure the following * It is recommended to build sunshade &...
Page 11
Proposal 1 Proposal 2 Rotate the left latch rightward until the notch locks limiting pin, rotate the right latch leftward until the notch locks limiting pin too. There are two spot drilling proposals available. Leave a minimum clearance of 133mm before the front surface of battery. For installation on a wall with its main supporting beams at a distance In order to guarantee a stable connection between battery and bracket, of 16 inches, it is recommended to adopt the first drilling spots.
to DC Breaker to DC Breaker Move battery back to the place confirmed in step 1. Drive M8 screw Positive Terminal Positive Terminal through notch of latch into wall. Plug 1 Plug 2 to PCS Network Plug Step 3 Insert power cables and network cable into battery terminals. 3.3.2 Floor Standing Installation Check and confirm battery is well fixed to wall.
4 Electrical Connection 1. Strip cable sheaths for 20±0.5mm, with orange positive 4.1 Preparation cable and black negative cable. Insert sealing and sealing nut along the cable as shown. 2. Insert the copper wires all into the joint sleeve. Link-In Link-Out Item No.
Page 14
Step 3 Make Network Cable A Make Network Cable B: 1. Strip cable sheaths for 15±0.5mm first. Insert sealing and sealing nut along the cable. Joint Sleeve Sealing Sealing Nut 1. Strip cable sheaths for 15±0.5mm first. Insert sealing 2. Network cable adopts standard 8-core cable. Insert eight and sealing nut along the cable.
5 Installation Steps under Parallel Connection Step 4 Insert power cables and network cable into battery terminals 1. Measure battery voltage with a multi-meter and ensure the Step 1 Install battery. voltage output is 0V under power-off mode. Power on batteries in condition of no load, measure their voltages with a 2.
to PCS Positive to PCS Negative Terminal Terminal Ensure batteries in parallel connection are from the same batch, same model and same manufacturer. Do not mix an old battery with a new battery. Batteries undergone less than 300 cycles are defined as new batteries.
6.3 Power on Battery Power on single battery by pressing POWER button 2 Press POWER button 1. If RUN and SOC lights on both batteries of any battery for two turn on normal, and the RUN lights on both No, Procedures Acceptation criteria seconds and observe batteries flicker for five times, two batteries...
7 Maintenance 7.1 Preparation * Battery replacement should be conducted by professionals. * Prepare tools like safety gloves, cross head driver and socket wrench. * Ensure undamaged appearance and complete accessories of new battery. * Do not change battery in rainy or stormy days. 3 Execute the default configuration until completing the installation.
Need help?
Do you have a question about the GBLI 6532 and is the answer not in the manual?
Questions and answers
Please ignore last message. Fault code BMS error 319 sent from inverter KVM0CLN0ED in respect of battery system GBLI6532. What does this mean? Data log serial number is GPG0CLT1C3
Fault Code 301 recorded stating it's a BMS fault. What is the implication of this? My system commenced working on the 27th January 2025.