BUSCH DOLPHIN LN 3001 A Installation And Operating Instructions Manual

Liquid ring compressors

Advertisement

Quick Links

Installation and
Operating Instructions
DOLPHIN
Liquid Ring Compressors
LN 3001 A
LN 3002 A
Busch GVT Ltd.
Unit A, Westmere Drive
Crewe, Cheshire CW1 6ZD
United Kingdom
0870223347/-0001_en / Original instructions / Modifications reserved
VACUUM APP
2020.04.27

Advertisement

Table of Contents
loading

Summary of Contents for BUSCH DOLPHIN LN 3001 A

  • Page 1 Installation and Operating Instructions DOLPHIN Liquid Ring Compressors LN 3001 A LN 3002 A Busch GVT Ltd. Unit A, Westmere Drive VACUUM APP Crewe, Cheshire CW1 6ZD United Kingdom 2020.04.27 0870223347/-0001_en / Original instructions / Modifications reserved...
  • Page 2: Table Of Contents

    Table of Contents Table of Contents 1 Safety........................... 3 2 Product Description ..................... 4 2.1 Operating Principle....................5 2.2 Application ......................5 2.2.1 LN Series ....................5 2.3 Start Controls ....................... 5 3 Transport ........................6 4 Storage......................... 6 4.1 Short Term (Up to 3 Months) ................6 4.2 Medium Term (3 Months to 6 Months) ..............
  • Page 3: Safety

    Safety Prior to handling the machine, this instruction manual should be read and understood. If anything needs to be clarified, please contact your Busch representative. Read this manual carefully before use and keep for future reference. This instruction manual remains valid as long as the customer does not change anything on the product.
  • Page 4: Product Description

    2 | Product Description Product Description OPD1 OPD2 OPI Operating liquid inlet Suction connection OPD1 Operating liquid drain Discharge connection Nameplate OPD2 Operating liquid drain (only for LN 3002 A) MS Mechanical seal connection Grease point NOTE Technical term. In this instruction manual, we consider that the term ‘machine’ refers to the ‘compressor’.
  • Page 5: Operating Principle

    Conveying of other media leads to an increased thermal and/or mechanical load on the machine and is permissible only after a consultation with Busch. The machine is intended for the placement in a non-potentially explosive environment unless a "Ex(outside)" sign is written on the nameplate, in this case please refer to the ATEX supplement for additional safety information.
  • Page 6: Transport

    • Drain the operating liquid from the machine and the system before storage. • Or add an anti-freeze solution. After testing, all Busch Dolphin compressors are vented and drained. Pumps contain- ing ferrous materials are preserved using a combined VPI (Vapour Phase Inhibitor) and Contact Inhibitor Oil (Vaporol™...
  • Page 7: Medium Term (3 Months To 6 Months)

    Installation | 5 4.2 Medium Term (3 Months to 6 Months) • Remove the shaft coupling guard (if not supplied as a bare shaft machine). • Rotate the machine shaft by hand 5 revolutions monthly to prevent bearing indentation. • Leave the shaft at approximately 90 degrees to the original position, using a temporary mark on the shaft to assist.
  • Page 8: Connecting Lines / Pipes

    • Make sure that the coupling is correctly aligned, see Fitting the Coupling [► 10]. If the machine is installed at an altitude greater than 1000 meters above sea level: • Contact your Busch representative, the motor should be derated or the ambient temperature limited.
  • Page 9: Operating Liquid Connection

    Installation | 5 5.2.3 Operating Liquid Connection The machine cannot be operated without an operating liquid system. The following dia- grams show examples of typical installations. The actual scope of delivery is always con- tractually agreed upon. OPD1 OPD2 Operating liquid inlet OPD2 Operating liquid drain (only for LN 3002 A) OPD1 Operating liquid drain...
  • Page 10: Operating Liquid Settings

    5 | Installation 5.3 Operating Liquid Settings CAUTION Running the machine in hazardous environment. Risk damaging the machine and pollution of the environment! • Install Alarm/ Shut down conditions of the service liquid flow. Refer to the ATEX attachement The settings of the service liquid depend on the compressor and the process. •...
  • Page 11: Commissioning

    Commisioning | 6 Commissioning CAUTION During operation the surface of the machine may reach temperatures of more than 70°C. Risk of burns! • Avoid contact with the machine during and directly after operation. NOTICE The machine is running without barrier liquid for mechanical seal. Will ruin the mechanical seal in short time! •...
  • Page 12: Start-Up

    6 | Commissioning 6.1 Start-Up NOTICE The machine shows any indication of heating or excessive noise. Risk of damaging the machine and/or system! • Shut-down the machine and determine the cause. The compressors are installed in such a way with several equipment and instruments similar to the shown P&ID.
  • Page 13: Regular Start-Up

    Commisioning | 6 Check the instruments. Check following valves before filling the compressor according to the P&ID • Open hand valves HV06 and HV07 to connect the LG. • Ensure that the draining of the separator is locked (HV05). • Make sure that the drain line of separator is locked (HV04) •...
  • Page 14: Shut-Down

    6 | Commissioning 6.2 Shut-Down 6.2.1 Regular Shut-Down If the operator has time to shut-down the machine: 1. Open HCV02 2. Close HCV01 To prevent a back flush of the ring liquid the valve in suction line (HCV01) shall be closed and the valve in bypass line (HCV02) shall be opened simultaneously. 3.
  • Page 15: Maintenance

    If an inlet screen is installed: • Check it and clean if necessary. • Change Oil see Lubrication: Oil [► 17]. Every 5 years • Have a major overhaul (contact Busch). 0870223347_LN3001-3002A_-0001_IM_en 15 / 24...
  • Page 16: Lubrication

    7 | Maintenance 7.2 Lubrication 7.2.1 Grease First filling of the bearing for commissioning is already made in manufacturers work shop. Monthly maintenance • To guarantee the correct operation, lubricate the bearing in the bearing bracket once per month with grease (type of grease see “lubrication plan”). Lubrication procedure •...
  • Page 17 Overhaul | 8 To guarantee the correct operation, the bearings have to be lubricated by the “Closed Opto-Matic Constant Level Oiler System” from Trico. First filling of the bearing for commissioning is already made in manufacturers work shop. The level of oil in the bearing bracket should be approx. in the middle of the sight glass i.e.
  • Page 18: Overhaul

    • Decontaminate the machine as much as possible and state the contamination status in a ‘Declaration of Contamination’. Busch will only accept machines that come with a completely filled in and legally binding signed ‘Declaration of Contamination’. (Form downloadable from www.buschvacuum.com) Decommissioning •...
  • Page 19: Dismantling And Disposal

    Use of non-Busch genuine spare parts. Risk of premature failure! Loss of efficiency! • The exclusive use of Busch genuine spare parts and consumables is recommended for the correct functioning of the machine and to validate the warranty. Spare parts kit Description Part no.
  • Page 20: Troubleshooting

    Busch). Solid foreign matter has • Remove the solid foreign entered the machine. matter or repair the ma- chine (contact Busch). • Install an inlet screen if necessary. Ice in the machine, the oper- • Carefully warm up the ating liquid has frozen.
  • Page 21 The machine runs in the • Check the direction of ro- wrong direction. tation- Defective bearings. • Repair the machine • (contact Busch). Worn coupling element. • Check the coupling and repair it if necessary. The machine runs too hot. Insufficient air ventilation.
  • Page 22: Technical Data

    12 | Technical Data 12 Technical Data LN 3001 A 60 Hz Slow 50 Hz 60 Hz Fast Suction volume flow m³/h 1900 2300 2700 Suction pressure bar abs. 0.75 … 1.25 Max. discharge pressure bar abs. 195 ► 2 bar 230 ►...
  • Page 23: Eu Declaration Of Conformity

    This Declaration of Conformity and the CE-mark affixed to the nameplate are valid for the machine within the Busch scope of delivery. This Declaration of Conformity is issued under the sole responsibility of the manufacturer. When this machine is integrated into a superordinate machinery the manufacturer of the superordinate machinery (this can be the operating company, too) must conduct the conformity assessment process for the superordinate machine or plant, issue the Declaration of Conformity for it and affix the CE-mark.
  • Page 24 Portugal United Arab Emirates info@busch.cl service_sales@busch.co.il busch@busch.pt sales@busch.ae China Italy Romania United Kingdom info@busch-china.com info@busch.it office@buschromania.ro sales@busch.co.uk Colombia Japan Russia info@buschvacuum.co info@busch.co.jp info@busch.ru info@buschusa.com Czech Republic Korea Singapore info@buschvacuum.cz busch@busch.co.kr sales@busch.com.sg www.buschvacuum.com 0870139442 / 200330 / © Busch Produktions GmbH...

This manual is also suitable for:

Dolphin ln 3002 a

Table of Contents