Advertisement

Quick Links

Series 2000 Top Dry
Heater Control
Operator's Manual
PNEG-743
Date: 5-3-2006
PNEG-743

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for GSi 2000 Series

  • Page 1 Series 2000 Top Dry Heater Control Operator's Manual PNEG-743 Date: 5-3-2006 PNEG-743...
  • Page 2: Table Of Contents

    Setting Gas Pressure.................9 Running The Dryer..................10 Run hours Display..................10 Top Dry Quick Start Procedure................12 Drying Rates For Shelled Corn................13 Factory Configuration....................14 Configuration Dip Switches (Normally Done At GSI)......14 Error Conditions....................15 Limit Switches...................15 Misc Error Numbers.................15 Multiple Heater Error Conditions.............15 Warranty.........................16...
  • Page 3: Safety

    S A F E T Y Series 2000 Top Dry Heater Control Heater Operation Thank you for choosing a GSI product. It is de- is written to help you understand safe operating pro- signed to give excellent performance and service cedures, and some of the problems that may be en- for many years.
  • Page 4: Safety Decals

    S A F E T Y A L E R T D E C A L S Series 2000 Top Dry Heater Control The GSI Group, Inc. recommends contacting your local power company, and having a representative survey your installation so the wiring is compatible with their system, and adequate power is supplied to your unit.
  • Page 5: Fan And Heater Operating Procedure

    O P E R AT I N G P R O C E D U R E Series 2000 Top Dry Heater Control The control panel of the Top Dry heater unit. Setup And Configuration Power Up Limit switches are checked upon power up. The There are three possible configuration modes for the Top Dry.
  • Page 6: Programming Top Dry Plenum And Grain Temperatures

    O P E R AT I N G P R O C E D U R E Series 2000 Top Dry Heater Control displayed. Note, that the cursors don't flash when turned on again (see section on "Running the in the normal display. They do flash when in the Dryer"...
  • Page 7: Programming Top Dry-Dry And Cool Timers

    O P E R AT I N G P R O C E D U R E Series 2000 Top Dry Heater Control from right cursor flashing). main or cycle solenoids shut off due to exceeding the temperature When the grain temperature set point, that burner will not come on again until the temperature gets to this point (or dry timer falls below the set point minus temperature differential.
  • Page 8: Setting Gas Pressure

    O P E R AT I N G P R O C E D U R E Series 2000 Top Dry Heater Control Setting Gas Pressure 1. At fan/heater turn toggle Airflow and switch to "ON" position. If purging on using a remote display or control panel...
  • Page 9: Running The Dryer

    O P E R AT I N G P R O C E D U R E Series 2000 Top Dry Heater Control 17. Press the "PROGRAM TEMPERATURE" but- "LO-FLAME" part of the cycle (see "Programming Top ton to change the temperature set points. Press it Dry Plenum And Grain Temperatures"...
  • Page 10 Q U I C K S TA R T P R O C E D U R E Series 2000 Top Dry Heater Control 1. Raise chutes. the set point should be 140°. 2. Fill drying chamber with grain. 15. Press the "PROGRAM TEMPERATURES" 3.
  • Page 11: Top Dry Quick Start Procedure

    D R Y I N G R AT E S / S H E L L E D C O R N Series 2000 Top Dry Heater Control Top Dry Batch Series 18' diameter 21' diameter 24' diameter 27' diameter 27' diameter 1 fan 1 fan...
  • Page 12 D R Y I N G R AT E S / S H E L L E D C O R N Series 2000 Top Dry Heater Control Top Dry Batch Series 30' diameter 30' diameter 36' diameter 36' diameter 1 fan 2 fan 1 fan...
  • Page 13: Factory Configuration

    Top Dry master Top Dry remote Switches (Normally Done with a remote dis- display at the bot- At Gsi) play at the bottom- tom-dip switch 1 & dip switch 6 & 7 on/ 6 on/all others off. These switches are used to con- all others off.
  • Page 14: Error Conditions

    This is im- portant because if the fan heater (Errors 9 through 11 are displayed only if multiple heat- is set up at GSI for 120 VAC and ers are tied together through serial link). the customer connects to 240...
  • Page 15: Warranty

    FOR A PERIOD OF 12 MONTHS AFTER RETAIL SALE TO THE ORIGINAL END USER OF SUCH PRODUCTS. GSI'S ONLY OBLIGATION IS, AND PURCHASER'S SOLE REMEDY SHALL BE FOR GSI, TO REPAIR OR REPLACE, AT GSI'S OPTION AND EXPENSE, PRODUCTS THAT, IN GSI'S SOLE JUDGMENT, CONTAIN A MATERIAL DEFECT DUE TO MATERIALS OR WORKMANSHIP. ALL DELIVERY AND SHIPMENT CHARGES TO AND FROM GSI'S FACTORY WILL BE PURCHASER'S RESPONSIBILITY.
  • Page 16 Authorities having jurisdiction should be consulted before installation occurs. The GSI Group, Inc. 1004 E. Illinois St. Assumption, IL 62510-0020 Phone: 217-226-4421 Fax: 217-226-4420 e-mail: gsisales@grainsystems.com internet: http://www.grainsystems.com Copyright © 2005 by The GSI Group Printed in the USA...

Table of Contents