System Start-Up Checklist - Kolpak PR Original Instructions Installation, Operation And Maintenance Manual

Refrigeration system
Table of Contents

Advertisement

Date System Installed:
Installer and Address:
Phone Number:
Start-Up Service Agency:
Phone Number:
Inspection Feature
Model Number:
Serial Number:
Electrical Volts:
Electrical Phase:
Amperage @ L1:
Amperage @ L2:
Amperage @ L3:
Ambient Temp:
Comp. Discharge Pressure:
Comp. Suction Pressure:
Suction Line Temp @ Comp.:
Discharge Line Temp @ Comp.:
Comp. Superheat:
Defrost Setting (4 day/45 min):
All electrical connections are tight:
Unit base properly supported:
Fans Running & No Vibration:
All guards, covers attached:
Refrigerant Sight Glass Clear:
Comp. Oil Level @ ½ Sight Glass:
Comp. Mounting Clips Removed:
Suction line insulated fully and properly supported:
Inspection Feature
Evaporator installed with nylon bolts with proper
airflow clearance:
Model Number:
Serial Number:
Electrical Volts:
Electrical Phase:
Suction Line Temp @ Evap:
Evap Superheat:
Thermostat Set:
Operating Temp:
TXV Bulb Properly Mounted:
All guards, covers attached:
All electrical connections are tight:
Defrost Heater Amp Draw:
Inspection Feature
Suction Lines Insulated:
Oil Trap at Base of Suction Riser:
Copper Drain Lines Sloped Min 1/2" ft:
Piping Supported Every 5':
Copper drain line heater attached, working, and
insulated:
Copper Drain Line Trapped Outside Freezer
Space:

System Start-up Checklist

/
/
(
)
-
(
)
-
Freezer
Condensing Unit
Data
Accept
°F
PSIG
PSIG
°F
°F
°F
Freezer Evaporator
Data
Accept
°F
°F
°F
°F
A
Freezer Piping
Data
Accept
Reject
Action Required
Reject
Action Required
Reject
Action Required
27